QuikTrip Park at
Grand Prairie / Grand Prairie AirHogs / 2008

|
Opening |
May 2008 |
|
Capacity |
4,500 fixed seats, 6,000
capacity |
|
Number of Suites |
13 |
|
Owner |
City of Grand Prairie |
|
Architect |
Sparks Architecture |
|
Contractor |
Hill & Wilkinson, Ltd. |
|
Ballpark Cost |
$20 million for entire
project, which includes land acquisition and
infrastructure costs |
|
Location |
Between Lone Star Park and
Nokia Theatre near Belt Line Road and Interstate 30,
Grand Prairie, Texas |
Mark Schuster tells us
this will be the best ballpark in the independent
American Association, but he might be aiming his
sights a little low. The new home of the Grand
Prairie AirHogs features permanent seating for
6,000 fans, a 6,000-square-foot sports bar and
restaurant beyond the left-field fence, a cigar
bar, a swimming pool overlooking the right-field
wall, and a 17,000 square-foot Wide World of Parks
Kids Zone, which includes a rock-climbing wall, a
miniature golf course and a wiffle-ball field,
among other attractions.

The pool
overlooking right field.
The pool actually juts
into the field of play, giving fans a unique
perspective on the action.

The outfield
party deck.
The left-field party
deck should be one of the most popular spots in
the ballpark. The 6,000-square-foot sports bar and
restaurant beyond the left-field fence features
over 50 flat-screen TV and a frosty rail designed
to keep drinks cold.

The ballpark
entrance, above and below.
The AirHogs moniker is
a reference to the aviation history in the Grand
Prairie area, and the exterior of the ballpark is
designed to reflect that heritage. The exterior
resembles an airplane hangar with control towers
on both ends, and when fans walk into the ballpark
the entryway will feature runway lights. On the
suites level there will be an Officers Club
seating 40 and a Hall of Fame Room seating 70.

The playing field was
installed by legendary groundskeeper Roger
Broussard of the Broussard family, which has been
doctoring playing surfaces since the days of Bill
Veeck.
Ventura Sports served
as developer of the ballpark project; it came in
on time and on budget.
|